Lagos closes Maryland service lane for six weeks

0
209

The Lagos State Government has said starting from Tuesday, (today) the service lane inbound Maryland from the end of the Gani Fawehinmi Park to the end of the second pedestrian bridge in Ojota would be partially closed for six weeks.

According to the  statement signed by the state commissioner for transportation, Dr Frederic Oladeinde, on Monday, the partial closure is to allow the contractor handling the stretch of the project from Ojota to Maryland to continue with the next phase of the construction, which includes the reconstruction of the Ikorodu road.

As a result of this new arrangement, motorists coming from Ikeja axis are advised to use 7UP road through Billings way to link Oregun/Kudirat Abiola Way inbound Ikorodu road by Ojota bus stop.

Oladeinde explained that traffic inward Ojota Bus stop/Maryland from the Ibadan-Lagos Expressway could either proceed to Oworonshoki/Gbagada or descend the loop by Abiola Garden to connect Ikorodu road (inbound Ketu).

He added that they could ascend the loop back to the Lagos-Ibadan Expressway through the loop beside LAMATA Office to access Ikorodu road to Ojota.

Also, the commissioner assured that adequate road signs have been provided to guide motorists movement.

Get every Post-UTM, Admission, List, JAMB, WAEC, NECO, and Schools Resumption Date, Breaking News on your WhatsApp Status Now - To join, click the links below.
Join Television Nigerian Whatsapp Now
Join Television Nigerian Facebook Now
Join Television Nigerian Twitter Now
Join Television Nigerian YouTUbe Now

This is another opportunity to own a faster-loading website to expand your business and take it digitally online. Meet the best website designer/master coder for any kind of website. Contact them now it is affordable Chat now: 09077260922

LEAVE A REPLY

Please enter your comment!
Please enter your name here